ed2k-server Active Backlog — Issue Index

Historical status: Retired from active planning on 2026-10-02. Preserved as provenance only.

This directory is the local engineering spec layer for the active Phase 1 production-hardening program. Workflow state lives in emulebb/ed2k-server issues and the public eMuleBB Suite project with Product = ed2k-server and Phase = Phase 1.

Current snapshot

Source of truth: EMULEBB_WORKSPACE_ROOT\repos\ed2k-server (master branch). Reviewed baseline: 604b2579160fd76680243aed472d58d9d8772dec. Lifecycle: active production-hardening candidate; not production-approved. Harness status: not selected. goed2k-server remains the deterministic shared-harness server until a separate integration decision. Milestone: production-readiness.

ID taxonomy

Items use ED2KSRV-<CLASS>-<NNN>, where CLASS is BUG, FEAT, REF, or CI. IDs are allocated per class and never reused.

Priority order

  1. Close remotely triggerable resource-safety and admission risks.
  2. Make every advertised protocol capability truthful.
  3. Establish a clean-room differential corpus against Go and observed Lugdunum behavior.
  4. Add production lifecycle, observability, load, soak, and canary evidence.

Active backlog

ID Priority Title
ED2KSRV-BUG-001 Critical Bound packed-frame decompression
ED2KSRV-BUG-002 Critical Enforce configured client and publication limits
ED2KSRV-BUG-003 Critical Bound TCP and UDP work admission and rate limits
ED2KSRV-BUG-004 Critical Make advertised protocol capabilities truthful
ED2KSRV-BUG-005 Critical Bound protocol parser strings and collections
ED2KSRV-CI-001 Major Build a clean-room differential protocol corpus
ED2KSRV-CI-002 Major Qualify load, soak, and controlled canary gates
ED2KSRV-CI-003 Critical Resolve dependency advisories and enforce an advisory gate
ED2KSRV-FEAT-001 Major Add graceful shutdown and supervised task lifecycle
ED2KSRV-FEAT-002 Major Add production observability and restart recovery
ED2KSRV-FEAT-003 Major Make source selection bounded and fair

Dependencies are recorded in each item. Resource-safety items are the first production gate; open high/critical dependency advisories also block a production recommendation. Load/canary qualification must exercise the final resource limits.